Closed Procurement Opportunities



Enabling Works Package

Construction Services: 3000222

EOIUNOG 12269 – Closed

Contract period is estimated to be from January 2017 to June 2017.

The United Nations General Assembly approved the establishment of the Strategic Heritage Plan (SHP) which includes the construction of a New Permanent Office Building (NPB) of approximately 22,371 m2, together with the complete renovation of the main Palais des Nations complex of buildings, much of which dates back to the 1930’s. The NPB “Building H” is to be constructed adjacent to the current building “E”. This solicitation concerns the services required to undertake site / civil works in preparation for the construction of the NPB (which will be the subject of a separate procurement tender).

Brief Description of the Baseline Requirements:

UNOG seeks qualified contractors to undertake enabling works, the services include but are not limited to:
  1. Site clearance;
  2. Dismantling works;
  3. Temporary installations
  4. Special foundations, retaining structures, support to basement, excavations and waterproofing; construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²);
  5. Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³).

EOI (attachment in pdf)



Contract 1

Construction of a New Office Building - Building H
Construction Services: 3000222

EOIUNOG 12854 – Closed

Contract period is estimated to be from August 2017 to end 2019.

SECTION I. INTRODUCTION

The United Nations General Assembly approved the establishment of the Strategic Heritage Plan ("SHP") which includes a new office building of approximately 23'500 square meters (gross external area), with a site footprint of approximately 8'300 square meters, to be constructed adjacent to the location of the current conference and office building “E”. The new office building is designed to step down a sloping site, consisting of six floors at the highest part and has two internal courtyards.

The new office building includes a double height reception lobby area and has primarily open plan flexible office space with some enclosed offices for some 1’400 workstations, meeting rooms, coffee shop, technical rooms, and support spaces. The new office building (“New Permanent Building” or "NPB") will be situated between the Chemin de l’Imperatrice and Building E on a sloping site in Ariana Park. Construction services are required to build a modern stepped six story reinforced concrete structured building with large glazed curtain wall system and accessible green roof terraces.

Brief Description of Requirements:

UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to:

  1. Superficial Excavation;
  2. Main Structure;
  3. Structural reinforcing and new opening to an existing underground parking structure.
  4. Façade;
  5. Roof; including green planted roofs, parts of the roofs are accessible roof terraces.
  6. Architectural Finishes;
  7. Furniture, Fixtures and Equipment ("FFE");
  8. Landscaping;
  9. Mechanical, Electrical and Plumbing Construction ("MEP");
  10. Building Information Modeling ("BIM");
  11. Testing, Commissioning, Handover, Training;
  12. Defects Liability and Warranty Works;
  13. Consultation and coordination with the applicable authorities.

See the attached EOI and the links to attachments with five images and four drawings of the new office building.

Statement of Qualifications Questionnaire (revision 1)
http://www.un.org/depts/ptd/pdf/EOIUNOG12854/EOIUNOG12854_Attachement2_Images.pdf
http://www.un.org/depts/ptd/pdf/EOIUNOG12854/EOIUNOG12854_Attachement3_Drawings.pdf
EOI (attachment in pdf)

Questions and Clarifications to EOI NPB


Information session presentation

Additional non-mandatory information session via video conference